China Quality PE Stretch Film Making Machine

Products

China Quality PE Stretch Film Making Machine

China Quality PE Stretch Film Making Machine

Overview Product Description Double Layers Co-extrusion PE Stretch Film Making Machine Features: Easy operating, long li

Send your inquiry

DESCRIPTION

Basic Info
Model NO. XYCPE-500
Assembly Structure Separate Type Extruder
Screw Twin-Screw
Exhaust Don′t Exhaust
Automation Automatic
Computerized Computerized
Film Width 500mm
Output 40kg/H
Thickness 0.01-0.05mm
Screw Diameter 60mm & 45mm
Screw L/D 30:1
Main Power 18.5kw & 7.5kw
Width of Die Head 625mm
Rewinding Motor 2.2kw
Transport Package Wrap Film Packing
Specification 5600*2600*1900mm
Trademark YOUJIA
Origin China
HS Code 84774090
Production Capacity 20 Set/Year
Product Description

Double Layers Co-extrusion PE Stretch Film Making Machine

Features:

  1. Easy operating, long life, energy saving
  2. Stable and reasonable extrusion
  3. High quality T-die for excellent film evenness and stability
  4. Enhanced cooling system (adopts 720 mm diameter primary cooling roller and 370 mm diameter secondary cooling roller)
  5. Advanced oscillation (swing) system
  6. Highest winding speed (up to 200m/min) among similar stretch film machines
  7. High production capacity: up to 350 kgs/h at film thickness 23 microns and 150 m/min
  8. Optional full automatic thickness gauge
  9. Excellent stretch film rolls quality for both hand use rolls and stretch use rolls

Product Parameters

China Quality PE Stretch Film Making Machine

Certifications

China Quality PE Stretch Film Making Machine

Packaging & Shipping

China Quality PE Stretch Film Making Machine

China Quality PE Stretch Film Making Machine

China Quality PE Stretch Film Making Machine

Company Profile

FAQ

1. Are you factory or trading company ?

We are factory specialized in plastic machine for many years, also we have the right to export goods by ourselves.

2. Where is your factory? How can i visit your company?
Our factory is located in Ruian city,zhejiang province, China. Its about 40 minutes from shanghai by plane(4 hours by train). We will pick you up on airport or station.
Welcome to visit our factory

3. How long is your delivery time?
Normally our delivery time is 15-30 days. If you need it ugently, we can make it about7 days

4. What are your terms of payment?
We accept 30% deposit, balance before shipment. And Irrevocable L/C at sight.

5. What package do you use for the product?
Be Coated with anti-corrosion oil, and covered with plastic film, wooden box package need extra cost.

6. Does your factory provide installation service?
Our engineer can go to customer factory to installation. Customer should prepare materials used to testing the machine in advance and should be responsible for the cost of supplier's technician, including round air tickets, visa cost, accommodation and salary 100USD/Day per person since the day start out until the day arriving at factory.

7. What's your warranty policy?
12 month guarantee and whole life maintance.

8. What is your company after sale service?
We would express the free replacement parts as soon as possible.